Precision Stamping Parts,Metal Stamping ,Precision Stamping ,Precision Metal Stamping Metal Processing Machinery Parts Co., Ltd. , http://www.nbprecisionparts.com
Specifications:
Description:
Pintle hook
Application:
Trailer
Material:
High manganese steelÂ
Material Grade:
GB, ASTM , AISI , DIN , BS, JIS, NF
Drawing Format accept:
Pdf,Jpg,CAD,IGS,STP,Pro-E
Mould Tooling:
Made by CNC Machine
Casting Process:
Mainly machining process:Investment Casting
By Milling
Surface Roughness
Ra1.6
Lead time for sample
25-30 days
Delivery for normal order
40-45 days
Heat Treatment
Water quenched
Surface treatment
Sand blast
Payment terms
T/T or negotiable
Delivery port departure
Ningbo, Shanghai port
Machining shop:
Test Equipment:
Â
Why Choose us:
*Zhongda had been engaged in Casting and Machining industry for more than 18 years.
Â
*The whole production cycle is monitored by our Quality Management System ISO 9001:2008 certified.
* We now supply all forms of casting parts and cnc machining parts:  lost wax investment casting, sand casting, and CNC Machining Services.Â
Â
* Rich OEM service experience.
Â
* Our products has been sold to more than 30 countries, we are very familiar with the whole markets, expecially for Europe, North America,Australia and Canada markets.
Â
* Our Commitment & Responsiblity:
   1.Competitive Price
   2.Strict Quality Control
   3.Quick Response To Any Inquires,Complaint,Technical Problem,etc
   4.Timely DeliveryÂ
     5.Small Quantity Acceptable
FAQ:
1. How long can I get the price?
Prices will be quoted within 24 hours after we get your inquiry with detailed information ( including drawings, material, surface treatment,quantity, special requirements,etc).
Â
2.How can I get a sample to check your quality?
On the case of quotation confirmed.Sample will be free of charge for customer approval, freight collect.
Â
3.How long can I expect to get the sample?
It depends on, normally 25 days~30 days (including mould making time). Samples will be shipped by DHL, FedEx, UPS, TNT or EMS,ect.
Â
4.What about the leading time for mass production?
It depends on the order quantity. Normally, 30~45 days after receiving of deposit.Â
Â
5.What is your MOQ?
We don't have a strict limit, small quantity is also workable.
Â