Wuxin Tunnel has successfully developed a new generation of WXHLC1215 archwork truck, which is applicable to the installation of steel arches and grille steel arches with full-section construction and step-by-step methods, anchor rods, steel mesh reinforcement, and monitoring with geological radars. , tunnel inspection, installation of feng shui pipe, defect repair, grouting and other high-altitude operations inside and outside the tunnel. Wuxin Tunnel-installed WXHLC1215 tunnel arching truck is an original product. It uses a number of independent innovation technologies to fill gaps in domestic tunnel arch installation equipment. The main technical features: 1. It adopts the chassis of the car, which is convenient for moving and transferring, and one device takes into account multiple tunnel ports; 2, equipped with two booms, two working platforms, two-armed frame work together. 3, with the vehicle with welding equipment, without additional equipment, convenient, fast and safe. 4, the clamp can be disassembled, replace other tunnel construction equipment, multi-purpose use. 5, can operate all the actions through the remote control, with the car equipped with intercom system, intelligent and convenient. 6, with a safety pedal, reminders and warnings to ensure safety. The use of Wuxin Tunnel-mounted WXHLC1215 tunnel arching work truck to carry out arch installation work requires only 4 people to operate a single machine, and only 30 minutes to install a single arch, which greatly increases the efficiency of arch installation and reduces manual investment. The labor intensity of workers. At present, the equipment has been successfully applied in a number of tunnel sites in Shandong, Yunnan, Guizhou, and has been fully affirmed by the construction unit! (This article is from Wuxin Tunnel)
Ion Exchange Resin, Cation Exchange Resin, Water Softener Resin, Iron Removal Resin, Tannin Removal Resin, Organics Removal Resin, Nitrate Removal Resin & HYPERMIX media for Hard Water Softener.
Provide different water softener media solutions depends on your local water quality.
Any questions, feel free to get in touch with Filterelated team, filterelated@gmail.com are ready to serve you! Ion Exchange Resin,Water Softener Resin,Iron Removal Resin,Tannin Removal Resin Filterelated Corp. , https://www.langfiltercartridge.com
Five new tunnel WXHLC1215 tunnel arch operation vehicle
Five new tunnel arching work site construction drawings
At present, the installation of domestic steel arches is mainly carried out by means of manual transportation. More than 10 people are installing steel arches, which has high labor intensity, low construction efficiency, long construction period, and great potential safety hazards.
Related news: Five new tunnel lift truck tunnel