Aluminum Foil Fin Stock also called Aluminum Fin Stock Foil.It is aluminum foil used to produce aluminum fin.Normally it is used in air conditioning parts.Such as Aluminum Foil Fin Stock used in condenser and evaporator.But it can also used to make those big air coolers used in power plant or other industrial applications.Aluminum Foil Fin Stock is regularly using alloy 8011 or 1100 or 1060 some areas,clients like to use 1050 or alloy 8079 which is not very common in China.Sometimes clients also need certain kind of surface lacquer for better corrosion resistance.Anyway,bring technology to the ground,we are always on the material innovation road. Wide Aluminum Foil,Aluminum Fin Stock,Aluminum Foil Cost,Hydrophilic Aluminium Fin Trumony Aluminum Limited , https://www.szaluminumplate.com
1. High quality material
3. Hot Runner: DME/LKM/HASCO
4. Mould Life: 500, 000~1, 200, 000 Shot
As a professional plastic mould manufacturer in China, we specialize in designing and making injection moulds for various plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Large Size Plastic Trash Bin Mold Mop Bucket Mould Mold could be designed and manufacured as soon as the contract signed.
Name
Description
Mould Material
45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc
Mould Base
LKM, HASCO ect.
Cavity
Single/multi
Runner
Hot/cold
Mould Design
3D/2D Drawing
Design Days
3 days
Design Software
UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic Material
PP, PC, PS, PE, PU, PVC, ABS, PMMA ect
Mo uld Life
300, 000-3, 000, 000 shots
Injection System
Pin-point-gate
Polish System
Mirror Polish
P ayment
40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time
15-60days
Specification
Depends on customers' requirements
Specification depends on customers requirements.
Business Steps
1. R& D
We support customers' R& D. We'll make the files or improve the design if you need
Â
2. Quotation Making
Mould Quotation will be finished in 1 day according to information we get.
Â
3. Negotiation
The quality, price, material, delivery time, payment item, ect.
Â
4. Mould Design
3-5 days for mould and product 3D/2D drawing design
Â
5. Mould
We will build the mould based on customers' requirements. Before making the mould, we'll send mould design to customers' approval first. Mould will be usually finished in 25-60 days
Â
6. Mould Testing
When moulds are finished, we will test the moulds to check if it will satisfy consumers' needs. And we will send samples for consumers' reference.
Â
7. Sample shoot
If the first sample come out is not satisfied by customers, we will modify the mould until it can meet customers' needs.
Â
8. Delivery
Delivery goods by sea or by air, according to customers' requirements.
Our advantages:
1: Excellent Cooling System with extended Cooling Pipe
2: Copper Cooling for better cooling effects
3: Pre-opening system to improve cycle time
4: Semi-Hot Runner System to save clients cost on moulds
5: Mould Available for recycle Material
6: Excellent control of polish system
7: Weekly report with mould processing photos available
8: Samples and each trial out video available
9: Punctual sample time and delivery time
10: Logistic service available
11: Engineers available in client's factory for training
12: High quality mould with reasonable price
FOR MORE DETAILS,WELCOME TO SEND ME AN INQUIRY.
Runner: Cold Runner
Design Software: UG
Installation: Fixed
Standard: HASCO
Customized: Customized
Mould Material: 45#, 50#, P20, H13, 718, 2738, Nak80, S136, SKD61
Design Day: 3 Days
Delivery Time: 15-60 Days
Deliery: by Sea
Trademark: REMO
Transport Package: Wooden Case
Specification: International
Origin: Taizhou China
HS Code: 8480719090
Large Size Plastic Trash Bin Mold: